Excavating Inspection in Cape Cod

Experience Counts

When the installation is complete an inspection is performed at the direction of the town's Board of Health.

Once the inspection is performed and the site passes muster the contractor creates an "As built" drawing that is submitted to the Board of Health and maintained on record in the town hall.

A Certificate of Compliance to Title 5 is then issued by the Board of Health and is filed with the "As built" schematic.

The process is complete


The design engineer and the contractor work closely to ensure compliance with the board of health local interpretations of Title 5 Standards